Technical work on the pool (13.12.18)


12/13/2018 at 18:00 (Moscow time) the technical works will be held (pool update). At the time of the update (5-10 minutes), mining will be unavailable. The following pools are also planned to be moved to the new server-side equipment.:

  • TUBE
  • RYO
  • ETHO

Please note that ETHO and RYO ports will change to connect miners:

  • RYO: 3301, 3302, 3303
  • ETHO: PPLNS – 1010, SOLO – 1011

Leave a Comment